Women have been vastly underrepresented in the male-dominated fields of science, technology, engineering, and mathematics (STEM) for decades, though their numbers have improved as engineering and other sciences have evolved over time to require increasing numbers of new STEM professionals.
American Governor Company

Success
You have successfully submitted your enquiry. Someone from our company will respond ASAP
American Governor Company
Women have been vastly underrepresented in the male-dominated fields of science, technology, engineering, and mathematics (STEM) for decades, though their numbers have improved as engineering and other sciences have evolved over time to require increasing numbers of new STEM professionals.
White Papers
Improved Governor Response at the Dinorwig Power Station
Dinorwig Power Station, located in North Wales, UK is one of the largest Pumped Storage facilities in Europe and has the capacity to generate electricity with six (6) 300MW pump generator units.
Expanding Hydro’s Contribution to Grid Stability
With the increased use of variable forms of generation such as wind and solar, there is increased concern not only about load matching, but grid stability itself. Hydropower plants often are proposed to back‐up variable sources due to the ability of hydropower plants to store their fuel/energy.
Keep Your Standards High: Increasing Unit Availability by Establishing a System of Excellence Anchored by Standardization
When major hydro construction projects are planned or when unexpected failures occur, units are taken out of service, resulting in decreased revenue and increased expenses. This unfortunate but unavoidable facet of outage management is often exacerbated by a lack of standardized systems. Standardized systems bring repeatability, ease of understanding, and, ultimately, innovation to any business seeking to improve the cycle time of projects.
Attracting Women to Hydro: The Push for Innovation and Gender Equality in an Aging Industry
Women have been vastly underrepresented in the male-dominated fields of science, technology, engineering, and mathematics (STEM) for decades, though their numbers have improved as engineering and other sciences have evolved over time to require increasing numbers of new STEM professionals.
Intelligent anomaly detection for industrial control systems
Mitigate cybersecurity risks with an integrated solution from Siemens and Nozomi Networks for anomaly-based intrusion detection for Operational Technology (OT) networks from a globally trusted expert in designing, building, and protecting industrial networks.