Civil engineering; Microtunnelling contractors; Shaft sinking services

Personnel

Engineering Director: Owen Mills;

Engineering Manager (Tunnels): Graeme Monteith;

Tunnelling Director: Phil Cull;

Tunnelling Manager: Ovi Frunza